School Details

South (456)

Unified Improvement Plan [pdf] | School Performance Framework

Website | Overview | Programs | Bond Info | Enrollment Data | Map | List of Schools

Main

1700 E. Louisiana Ave. 80210
Tel: 720-423-6000
Fax: 720-423-6280

Principal: Jen Hanson

Grade Levels: Grade 9 - Grade 12

Uniforms: No
Discovery Link: No
Magnet Program: No
Charter School: No
Non-Traditional School: No
Intensive Pathways: No


Programs

Programs

  • Academic Club or Competition
  • ACT/SAT Prep and Coordinators
  • Advanced Placement (AP)
  • Arts or Music clubs
  • Arts, A/V Technology and Communication
  • AVID
  • Baseball (Boys)
  • Basketball (Boys)
  • Basketball (Girls)
  • Business Education
  • Career and Technical Education Resource Specialist
  • Career Connections Experience
  • College Readiness Coordinators
  • Community Service Club or Organization
  • Concurrent Enrollment
  • Credit Recovery
  • Cross Country (Boys)
  • Cross Country (Girls)
  • Denver Scholarship Foundation Future Center
  • Fine Arts
  • Football (Boys)
  • Golf (Boys)
  • Golf (Girls)
  • Gymnastics (Girls)
  • Honors Curriculum
  • Junior Reserve Officers' Training Corps (JROTC)
  • Lacrosse (Boys)
  • Math, Engineering, Science, Achievement (MESA)
  • Multi Intensive - Severe Special Education Service
  • Organization or club based on ethnicity or culture
  • Performing Arts
  • Pre-Collegiate Programs
  • School Yearbook or Newspaper
  • Soccer (Boys)
  • Soccer (Girls)
  • Softball (Girls)
  • Spirit
  • Student Leadership
  • Tennis (Boys)
  • Tennis (Girls)
  • Track and Field (Boys)
  • Track and Field (Girls)
  • Volleyball (Girls)
  • World Languages
  • Wrestling (Boys)

Bond

Bond Information

Denver Public Schools - 2012 General Obligation Bond Project Status
Department of Facilities Management, Facilities Planning

2014 ADA-­‐Related Improvements -­‐ Eliminate selected architectural barriers to enhance accessibility for individuals needing accommodations required by the Americans with Disabilities Act. - Planned

2014 Boiler Room Pumps and Piping -­‐ Replace pumps and associated piping within the boiler room. - Planned

2014 Building Code Issues Inclusive -­‐ Correct selected building code deficiencies. - Planned

2014 Building Remodel/Renovation Inclusive -­‐ Correct various safety issues associated with science rooms. - Planned

2014 Built-­‐up Roofing -­‐ Replacement of selected built-­‐up tar and gravel roofs. - Planned

2014 Electrical Switchgear -­‐ Upgrade selected components in the existing electrical system to increase capacity to the building. - Planned

2014 EPDM / PVC / Single ply Roofing -­‐ Replace selected single-­‐ply roof membranes. - Planned

2014 Information Technology-­‐related Air Cooling System -­‐ Replace the air conditioning system in the telecommunications equipment room. - Planned

2014 Other -­‐ Cooling Generating Sys -­‐ Improvements to selected, existing mechanical equipment to enhance cooling in the building. - Planned

2014 Passenger Elevator Equipment -­‐ Replace the hydraulic elevator shaft with a double bottom cylinder for code compliance. - Planned

2014 Paving & Surfacing -­‐ Parking Lots -­‐ Pave the existing dirt lot. The scope includes re-­‐grading contours to improve storm-­‐water drainage, the installation of concrete curbs, gutters, walks, asphalt pavement, striping of pavement, and landscaping with irrigation. - Planned

2014 Storm Sewer Inclusive -­‐ Install new storm drain system for selected areas. - Planned

2014 Water Piping. - Planned

2014 Clay Tile Roofing. - Planned

2014 Auditorium Ceiling. - Planned

2014 Science Lab Upgrades. - Planned

2014 Science Room Renovation -­‐ Building Remodel/Renovation Inclusive -­‐ Fully remodel selected areas within the facility. - Planned

Enrollment Data

Map

Map